Product Details
Place of Origin: GuangZhou, China
Brand Name: RUI - HE
Certification: RoHS, FDA, MSDS, SGS, REACH, PAHS, ISO9001:2016, etc
Model Number: 6250-60
Payment & Shipping Terms
Minimum Order Quantity: 20KG or 200KG
Price: Negotiation
Packaging Details: 20 kg pails or 200 kg drums
Delivery Time: 5 -15 days
Payment Terms: Western Union, L/C, T/T, Paypal
Supply Ability: 1000 tons per day
Type: |
Food Grade |
Hardness: |
60 |
Curing Time: |
5 Mins |
Port: |
Guangzhou / Shenzhen |
Sample: |
Available |
Odor: |
Odorless |
Type: |
Food Grade |
Hardness: |
60 |
Curing Time: |
5 Mins |
Port: |
Guangzhou / Shenzhen |
Sample: |
Available |
Odor: |
Odorless |
Food Grade Liquid Silicone Rubber For Baby Feeding Nipples With LFGB
Description
Style NO. | 6250-60 |
End use | food mold, nipples |
Curing type | Platinum vulcanization |
Shelf life | 12 months |
Payment term | L/C, T/T, Western Union, Paypal |
Production Process
Typical Property
|
This data is a typical reference value and is for reference only.
Characteristics
Physical
properties
|
RTV mold silicone compound |
Excellent fluid property | |
Mold release property | |
Thermal resistance | |
Stable mould dimension | |
Good physical property, high tear streangth | |
Excellent stability and flexibility at low temperature |
|
Chemical
properties |
Vulcanizing time and operation time adjustable |
Deeper vulcanizing available | |
Great weather resistance | |
Excellent chemical resistance | |
Sterilisable with ethylene oxide, steam and gamma radiation |
|
good durability and long processing life of the mould. |
Instructions
Here is a look at the LSR molding process:
1. LSR A + B components typically come in a 5 gallon pail or 55 gallon drum. A process controlled pumping kit presses down on the buckets to force the material into static mixer and feed into the injection unit.
2. Then, streams of pigment can be added and controlled. In the injection, press material will be mixed together additionally with a screw and pushed forward to create a “shot” of material, or the amount needed to fill the mold.
3. After the material is injected into the mold, it will then stay clamped together to cure the LSR. Then, either an operator or a robot will remove the cured product from the mold and the cycle repeats. It is a very quick efficient process that typically averages 30 seconds.
FAQ
Q: Is your company a manufacturer?
A: Yes, we are. Meanwhile, we own professional R&D team.
Q: Do you accept custom requirements?
A: Yes, we have a professional R&D department with 15-years work experience.
Q: Does your company provide samples?
A: Yes.
Q: How long can I expect to get the sample?
A: Usually 2-4 workdays.
Packing & Storage
Available in 20kg pails or 200kg drums.
Store in a cool, dry place out of direct sunlight, use it within 12 months from the day of manufacture.